Companies where VesterVind has a substantial shareholding

Serving the whole value chain in hydropower..

Picture Showing Unity Dam in Western USA.

The VesterVind Group

The VesterVind Group is to become an International Leading Corporation in the development and utilization of Small Hydro Power plants and technology

VesterVind Sp.zo.o is located outside the historical City of Cracow in Southern Poland.

 

 

Technology

 

NEWS

The VesterVind Group

 

AmNor Hydro West obtain Preliminary Permit at Unity Dam

 

The proposed project will be located at the Unity Reservoir, a Bureau of Reclamation project.  The dam is located near the City of Hereford, Oregon to the north of Road no 245.

 

25.07.2011

 

AmNor Hydro West obtain Preliminary Permit at Horn Rapids Dam

 

The proposed project will be located at the Yakima Reservoir. The project dam is located in 37 Water Resource Inventory Areas (WRIA) – Lower Yakima, near the City of Richland, Washington state

 

25.07.2011

 

Innovation in Technology, hand in hand with the education of tomorrows Hydro Power Engineers

Cracow University of Technology and CEDI Sp.zo.o forms Laboratorium MEW Dłubnia sp. z o.o. as a joint venture.

 

Two 75 kW turbines to South of Poland

On behalf of Turbinova AS, CEDI will install two integrated Turbo sets in a river South in Poland during March 2011.

 

CEDI signs the first contract in 2011 for Small Hydro Power Plant Concept development in Malopolska.

CEDI has contracted a project for the  development of a    small  hydro   power plant in Raba river, in the Malopolska region south in Poland. This is the first such project contracted in 2011.

 

 

AmNor Hydro West’s Filing for Preliminary Permit at Hiram Dam accepted by FERC

 

The proposed project will be located at the Lake Washington Ship Canal. The project dam is located in 08 Water Resource Inventory Areas (WRIA) – Cedar Sammamish, near the Ballard, Washington state

 

24 Jan.2011

 

 

AmNor Hydro West’s Filing for Preliminary Permit at Clear Creek Dam accepted by FERC

 

The proposed project will be located at the Clear Lake Reservoir, a Bureau of Reclamation project.  The dam is located near the City of Naches, Washington to the south of Road no 12. 

 

24 Jan.2011

 

 

Phone: +48 66 205 2066

Fax: +48 12 282 04 49

E-mail: post@vestervind.com

Preliminary Permit
Obtained

Home

 

Contact

 

About

 

The Library

Check It